Office Building (Fragment: many inaudible parts in recording)
by
, 09-04-2014 at 06:03 AM (489 Views)
DJ Log: August 4, 2013 – 7:30AM (USA Eastern)
• NON-DREAM • NOTES • DREAM • LUCID •
(Note: Do not use voice recorder while driving with windows open in a diesel truck with straight-pipe exhaust. lol)
Walking with my boss and our controller, talking about the office building. We're walking down a hall between rows of cubicles and there is a whiteboard off to the side which has a high-rise building drawn on it. The floors were labeled and the whole 1st floor was mine. One of the other guys had a whole floor to himself too.